Philvolt

The Meralco Bill Slayer

Upload your Meralco bill. See in 60 seconds how much you will save.

Real system size, real savings estimate, real price range. On screen, instantly. No sales call. No waiting for a callback.

How It Works
Meralco Net Metering25-Year Panel WarrantySingle Dedicated CrewLuzon Coverage

Instant Quote Calculator

How much will you save?

Enter your average monthly Meralco bill.

₱

Enter your Meralco bill above to see your quote.

Most homeowners save 60–85% within a year of going solar.

How It Works

From Meralco bill to net metering, in six steps

No callback needed to get started. Just an instant quote, then a real survey to confirm it.

01

Upload your Meralco bill

Enter your average monthly bill (or upload a photo). Takes 10 seconds.

02

Get your instant quote

Our calculator sizes your system and estimates savings and price range on screen, right away.

03

Site survey

We schedule a technical survey to confirm roof condition, orientation, and electrical setup.

04

Permits and paperwork

We handle Meralco net-metering application, permits, and utility coordination.

05

Installation

One dedicated crew installs your system, typically within 1-3 days depending on size.

06

Net metering + done

System is energized, net meter installed, and you start seeing savings on your next bill.

Recent Installs

Real installations, real savings

Swipe through photos from our installs. Tap any photo for the full project story.

See all installs
5 kWp Residential hybrid solar install: Rooftop array going up

Rooftop array going up

5 kWp Residential hybrid

50 kWp School campus solar install: Crew laying panels on the main roof

Crew laying panels on the main roof

50 kWp School campus

8 kW / 16 kWh Residential hybrid solar install: Rooftop array seen from above

Rooftop array seen from above

8 kW / 16 kWh Residential hybrid

24 kW / 16 kWh Church hybrid solar install: Panel rows on the metal roof

Panel rows on the metal roof

24 kW / 16 kWh Church hybrid

5 kWp Residential hybrid solar install: Panels mounted along the roof line

Panels mounted along the roof line

5 kWp Residential hybrid

50 kWp School campus solar install: Completed array along the ridge

Completed array along the ridge

50 kWp School campus

8 kW / 16 kWh Residential hybrid solar install: Wall-mounted inverter with the battery below

Wall-mounted inverter with the battery below

8 kW / 16 kWh Residential hybrid

24 kW / 16 kWh Church hybrid solar install: Inverter, protection box and battery on one wall

Inverter, protection box and battery on one wall

24 kW / 16 kWh Church hybrid

5 kWp Residential hybrid solar install: Inverter and protection wiring

Inverter and protection wiring

5 kWp Residential hybrid

50 kWp School campus solar install: Ridge-line view of the full roof

Ridge-line view of the full roof

50 kWp School campus

8 kW / 16 kWh Residential hybrid solar install: Panel groups across the roof slopes

Panel groups across the roof slopes

8 kW / 16 kWh Residential hybrid

24 kW / 16 kWh Church hybrid solar install: Paralleled inverters in the equipment room

Paralleled inverters in the equipment room

24 kW / 16 kWh Church hybrid

50 kWp School campus solar install: Mounting rails and panel rows

Mounting rails and panel rows

50 kWp School campus

Prefer to just message us your bill?

Send your Meralco bill amount or a photo of it on WhatsApp and we will reply with a quote, no calculator needed.

Chat on WhatsApp

Solar Guides

Explore more

Practical answers on sizing, net metering, warranty, and costs.

Business, farms and commercial