Philvolt
All installs

Teresa, Rizal

Teresa School Campus: 50 kWp Rooftop Solar

A 50 kWp grid-tied system for a school campus in Teresa, Rizal, our largest install to date. The school's daytime operation is a natural fit for solar.

Click to zoom

System Size

50 kWp

Panels

90 pcs

Inverter

50 kW Grid-Tie (5 inverters)

Installation

7 days

Bill Before

₱80,000

Bill After

₱24,000

The problem

Air conditioning in the classrooms, computer lab, and office made up a very large part of the school's monthly electricity cost, money that could go to programs for students.

The solution

90 panels on the main building roof and a 50 kW grid-tie inverter. Grid-tied was chosen because the school's consumption happens during the day, with peak load during class hours, so almost everything the panels produce is used directly.

The result

A large share of the campus's daytime consumption now comes from solar, and the monthly bill dropped noticeably. The installation was carried out without disrupting classes.

Want savings like this?

Get your own quote in 60 seconds. No callback needed.

Get My Instant Quote

Solar Guides

Explore more

Practical answers on sizing, net metering, warranty, and costs.