Teresa School Campus: 50 kWp Rooftop Solar
A 50 kWp grid-tied system for a school campus in Teresa, Rizal, our largest install to date. The school's daytime operation is a natural fit for solar.
System Size
50 kWp
Panels
90 pcs
Inverter
50 kW Grid-Tie (5 inverters)
Installation
7 days
Bill Before
₱80,000
Bill After
₱24,000
The problem
Air conditioning in the classrooms, computer lab, and office made up a very large part of the school's monthly electricity cost, money that could go to programs for students.
The solution
90 panels on the main building roof and a 50 kW grid-tie inverter. Grid-tied was chosen because the school's consumption happens during the day, with peak load during class hours, so almost everything the panels produce is used directly.
The result
A large share of the campus's daytime consumption now comes from solar, and the monthly bill dropped noticeably. The installation was carried out without disrupting classes.